MIL-I-60513A
203Contents of box exposed Visual
204Box damaged Visual
205Marking missing, incorrect, or illegible Visual
206Number of units incorrect Visual
4.2.2.8 Box, Fiberboard (Outer), Alternative, Ammunition, Packing, Drawing 9216824.
Critical
None defined
Major
None defined
Minor
201Contents looseManual/visual
202Box broken or damaged Visual
203Number of units contained incorrect Visual
204Marking missing, incorrect, or illegible Visual
205Tape incomplete Visual
4.2.3 Inspection testing. The following tests shall be performed in accordance with 4.3.
4.2.3.1 Initiator pin security. The initiator pin of each subassembly shall be subjected to the initiator pin security test. Failure of any unit to comply with the requirement of 3.4 shall be cause for rejection of the subassembly.
4.2.3.2 Breakawaytorque. Eachchamberand cap assemblyshallbesubjected tothebreakaway torque test. Failure of any assembly to comply with 3.5 shall be cause for rejection of the assembly.
4.2.3.3 Residual magnetism. Each initiator shall be subjected to the test for excessive residual magnetism as specified in 4.3.3. Failure of any initiator to comply with 3.6 shall be cause for rejection of the initiator.
4.2.3.4 Functional tests. The following tests shall be performed by the Government.
4.2.3.4.1 Ballistics. Twenty-one units from each lot shall be tested to determine compliance with 3.8. The units shall be temperature conditioned as provided in table II. Failure of any unit to comply with 3.8 shall be cause for rejection of the lot.
TABLE II. Conditioning temperature.
8
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business