/+.&6.
15
3.5.4 Salt fog. The cartridge shall not initiate or incur any internal or external damage or degradation
when a saltfog test is applied in accordance with 4.3.8.
3.5.5 Shock. The cartridge shall not initiate or incur any internal or external damage or degradation
when a terminal peak sawtooth shock is applied in accordance with 4.3.9.
3.5.6 Functioning. The cartridge shall meet the requirements of 3.5.6.1 when fired in accordance with
4.3.10.
3.5.6.1 Dent block indent. Each cartridge shall supply a high order detonation to demonstrate a
minimum dent of 0.040 inch in a 6061-T6 aluminum dent block with the booster charge in contact with
the dent block over the temperature range of !65EF to 200EF.
3.6 Workmanship. The cartridge shall be constructed and finished in a manner to assure compliance
with all requirements of this specification. Particular attention shall be directed to dimensions, finishes,
sealing, and assembly operations.
4. VERIFICATION
4.1 Classification of inspections.
a. First article inspection (see 4.2.1)
b. Production inspection (see 4.2.2)
c. Lot acceptance inspection (see 4.2.3)
4.2 Inspections.
4.2.1 First article inspection. Unless otherwise specified in the contract or purchase order (see 6.2), a
first article sample of 39 cartridges conforming to Drawing 850AS895 shall be subjected to first article
testing. Thirty-six of these cartridges shall be expended in the tests listed in table II and three cartridges
shall be retained for investigative purposes. Any damage inflicted by the environmental treatments which
would adversely affect the performance of the item in service application shall be cause for rejection of
the first article sample. Any further production prior to notification by the contracting agency of first
article sample acceptability shall be at the contractor's risk. Failure of any cartridge to comply with the
requirements of section 3 shall be cause for rejection of the first article represented.
4.2.2 Production inspection. All production cartridges manufactured under the contract shall be
inspected and screened for defects. Cartridges failing to meet the requirements that are listed in table I
shall be rejected and removed from the lot.
TABLE II. First article test plan.
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business