/+.&6.
15
4.3.9 Shock. The cartridge, with any protective means removed, shall be subjected to the shock profile
of figure 5, with the following requirements:
FIGURE 5. Terminal peak sawtooth shock pulse profile and tolerance limits.
a. The cartridges shall be mounted to the shock/vibration test fixture to simulate the actual service
installation.
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business