MIL-DTL-50699B
Minor
201
Contents loose
Manual/Visual
202
Carton broken or damaged
Visual
203
Number of units contained incorrect
Visual
204
Marking missing, incorrect, or illegible
Visual
205
Tape incomplete
Visual
4.5.3 Inspection testing. The following tests shall be performed in accordance with 4.6.
4.5.3.1 Shear pin strength. Fifty pins from each lot of shear pins tested by the contractor shall be
tested for single shear strength. Failure of any pin to comply with 3.9 shall be cause for rejection of the
lot.
4.5.3.2 Protective finish. Unless otherwise specified, sampling plans and procedures in
determination of the acceptability of coated parts and articles submitted by a supplier shall be in
accordance with 3.10.
4.5.3.3 Residual magnetism. Each assembly shall be subjected to the test for excessive residual
magnetism. Failure of any assembly to comply with 3.6 shall be cause for rejection of the initiator.
4.5.3.4 Breakaway torque. Each initiator shall be subjected to the breakaway torque test. Failure
of any assembly to comply with 3.5 shall be cause for rejection of the assembly.
4.5.3.5 Leak test. Each M104 Initiator and each retainer and ignition device assembly shall be
subjected to a leak test. Failure of any M104 Initiator or retainer and ignition device assembly to comply
with 3.4.4 shall be cause for rejection of the M104 Initiators or retainer and ignition device assembly. This
test must be done by the contractor before final assembly.
4.5.3.6 Ignition device sensitivity. A sample of ignition devices, selected in accordance with
table II from the initial production lot and each subsequent lot, shall be assembled and crimped into the
retainer and tested for sensitivity.
4.5.3.6.1 All fire. One half the ignition device sample size, crimped into the retainer, shall be tested
at the 25.48 inch-ounce energy level in accordance with 3.4.3. Any ignition device failing to comply with
3.4.3 shall be cause for rejection.
4.5.3.7 Functional tests. The following tests shall be performed by the Government.
4.5.3.7.1 Ballistics. Twenty-one units shall be tested to determine compliance with 3.8. The units
shall be temperature conditioned as provided in table IV. Failure of any unit to comply with 3.8 shall be
cause for rejection of the lot.
13
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business