MIL-T-46583C
2.1.2 Other Government documents, drawings, and publications. The following Government drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2).
DRAWINGS
NAVAL ORDNANCE STATION (CAGE Codes 19200 and 19203)
10522631 Thruster, Cartridge Actuated, M3A3 Metal Parts Assembly
8796719 Box, Fiberboard (Inner), Packing, Ammunition, For Thruster, Cartridge Actuated, M3A3
8797270 Box, Packing, Ammunition, For Thruster, Cartridge Actuated, M3A3
9217573 Box, Fiberboard (Outer), Alternative, Packing Ammunition, for Thruster, Cartridge
Actuated, M3A3
U.S. Air Force
TPO 00-953-5567 Thruster, Cartridge Actuated, M3A3
(Application for copies should be addressed to: Commanding Officer, Naval Ordnance Station, Data Control
Branch (Code 3720), Indian Head, MD 20640-5035.)
2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 First article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected to the first article inspection (see 4.3 and 6.3).
3.2 Materials. All materials used in the manufacture of the thrusters shall conform to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidder's selections shall be clearly stated in the proposal.
3.2.1 Raw material. The contractor shall be responsible for selecting from the classification list contained in the raw material specification the surface and physical condition of the raw material intended for use in manufacture.
3.3 Hardness and other physical properties. Hardness and other physical properties required by the
drawing shall be uniform throughout the part within specified tolerances. Requirements for all alloy steel parts shall be achieved by quenching and tempering.
2
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business