MIL-I-46576A(OS)
shall be removed from the production lot. Film interpretation of the radiographs shall verify the presence and correct positioning of the following parts:
a. O-ring, PIN MS28775-009 b. O-ring, MS28775-214
c. Firing Pin, PIN 8594744
d. Firing Pin Housing, PIN 8593012 e. Retainer, Cartridge, PIN 8593013 f. Cap, Setscrews No. 10 (.190)
g. Cartridge, Impulse M73, PIN 8594157 h. Chamber, PIN 8593014
i. Cap, PIN 8595254
4.3.4 Functional.
4.3.4.1 Ballistics. The test sample shall be rigidly supported in the fixture and fired by a source delivering an output of 700 +25, •0 psig at the end of 15 feet of aircraft hose, MS28741-4, at 70 ± 5•F. The sample shall be tested within 5 minutes after removal from the temperature conditioning chamber. When this time limit is exceeded, the sample units shall be reconditioned in accordance with 4.3.4.2. Required pressure readings shall be taken as specified in 3.6.1.
4.3.4.2 Temperature conditioning. Each assembled initiator shall be conditioned for not less than 4 hours nor greater than 24 hours. When reconditioning initiators at •60•F, all condensation shall be removed from the exterior surfaces before returning the initiator to the conditioning chamber.
4.4 Inspection of packaging. The sampling and inspection of the packaging, packing, and container marking shall be in accordance with section 5.
5. PACKAGING
5.1 Packing and marking. Packing and marking shall be Level A or B, as specified by the contracting activity (see 6.2). Level A shall be in accordance with Drawings 8796541 and 8796542. Level B shall be in accordance with Drawings 8796541 and 9216934.
5.1.1 Lot numbers. Lot numbers shall be in accordance with MIL-STD-1168.
5.2 Air Force packaging. Air Force packaging shall be in accordance with TPO 00-932-5031.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful but is not mandatory.)
6.1 Intended use. The initiator assembly is used in conjunction with other propellant actuated devices in Aircrew Emergency Escape Systems.
6.2 Acquisition requirements. Acquisition documents must specify the following:
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business