MIL-DTL-82763B
2.2.2 Other Government documents, drawings, and publications. The following other Government
documents, drawings, and publications form a part of this document to the extent specified herein. Unless
otherwise specified, the issues of these documents are those cited in the solicitation or contract.
DRAWINGS
NAVAL ORDNANCE STATION, INDIAN HEAD (GAGE CODE 19200 and 19203)
10520551
Initiator, Cartridge Actuated, M27, Metal Parts Assembly
8830984
Box, Fiberboard (inner) packing, Ammunition for Initiator, Cartridge Actuated
M27, M86, M87, M99, or XM107
8830985
Box, Packing, Ammunition, for Initiator, Cartridge Actuated M27, M86, M87,
M98, M99, or XM017
9241155
Box, Fiberboard (Outer) Alternative Packing, Ammunition, for Initiator,
Cartridge Actuated M27, M86, M87, M98, M99, or XM107
(Application for copies should be addressed to Commanding Officer, Naval Surface Warfare Center,
Indian Head, Technical Information Branch (Code 4230), Indian Head, MD 20640.)
Non-Government publications. The following documents form a part of this document to the
2.3
extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the
solicitation or contract.
AMERICAN SOCIETY FOR QUALITY
ASQ A8402
Quality Management and Quality Assurance Vocabulary
ASQ Z1.4
Sampling Procedures and Tables for Inspection by Attributes
(Application for copies should be addressed to the American Society for Quality Control, PO Box 3005,
611 E. Wisconsin Ave., Milwaukee, WI 53201-4606.)
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION
ISO 3601-3
Fluid power systems -- O-ring -- Part 3: Quality acceptance criteria
(Application for copies should be addressed to the International Organization for Standardization,
1, ch. de la Voie-Creuse, Case postale 56 CH-1211 Geneva 20, Switzerland)
Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict
2.4
between the text of this document and the references cited herein, the text of this document takes
precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a
specific exemption has been obtained.
3. REQUIREMENTS
Materials. All materials used in the manufacture of the initiators shall conform strictly to the
3.1
specifications referred to on the respective drawings unless specific approval in writing covering a
departure there from has been obtained from the cognizant Navy design activity prior to manufacture.
When alternate materials or methods of manufacture are specified on the drawings, the bidder's selections
shall be clearly stated in the proposal. The remanufactured initiator metal parts assembly shall contain a
new seal, initiator spring, O-ring, and safety pin.
2
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business