MIL-DTL-60201D
4.2.2.7 Box, Ammunition, Packing, Drawing 8797742.
Critical
None defined
Major
None defined
Minor
201
Contents loose
Manual
202
Strapping missing, loose, broken, or
improperly engaged
Visual/Manual
203
Contents of box exposed
Visual
204
Box damaged
Visual
205
Marking missing, incorrect, or illegible
Visual
206
Number of units incorrect
Visual
4.2.2.8 Box, Fiberboard (Outer), Alternative, Ammunition, Packing, Drawing 9217579.
Critical
None defined
Major
None defined
Minor
201
Contents loose
Manual/Visual
202
Carton broken or damaged
Visual
203
Number of units contained incorrect
Visual
204
Marking missing, incorrect, or illegible
Visual
205
Tape incomplete
Visual
4.2.3 Inspection testing. The following tests shall be performed in accordance with 4.3.
4.2.3.1 Breakaway torque.
4.2.3.1.1 Retainer guide and sleeve. Each retainer guide and sleeve subassembly shall be subjected to
a breakaway torque. Failure of any subassembly to comply with the requirements of column C, table I in 3.3
shall be cause for rejection of the subassembly.
4.2.3.1.2 Head and retainer guide. Each head and retainer guide subassembly shall be subjected to a
breakaway torque. Failure of any subassembly to comply with the requirements of column C, table I in 3.3
shall be cause for rejection of the subassembly.
4.2.3.1.3 Head and body. Each head and body assembly shall be subjected to a breakaway torque.
Failure of any assembly to comply with the requirements of column C, table I in 3.3 shall be cause for
rejection of the assembly.
8
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business