MIL-T-60694B
3.6.4 Integrated plant products. When remanufacturing and loading of the assembly is performed in
an integrated plant, the metal parts assembly requirement may be waived and the residual magnetism
requirement performed on the loaded assembly only.
3.6.5 Threaded component parts. Class 2A or 2B thread gage shall be used on remanufactured
component parts inspection versus class 3A or 3B thread gage required on new hardware for thrusters.
3.6.6 Remanufactured components. Remanufactured components which require modification shall be
modified in accordance with instructions noted in 6.5.
3.7 Workmanship. Thrusters shall be free of cracks, splits, or other defects which might prevent proper
mating with connecting parts or proper functioning of the device.
3.7.1 Metal defects. All components shall be free from cracks, splits, cold shuts, inclusions, porosity,
or any similar defect.
3.7.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or
which might be injurious to personnel handling the item.
3.7.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust, corrosion, or other
foreign matter.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the
contractor is responsible for the performance of all inspection requirements (examinations and tests) as
specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his
own or any other facilities suitable for the performance of the inspection requirements specified herein, unless
disapproved by the Government. The Government reserves the right to perform any of the inspections set
forth in this specification where such inspections are deemed necessary to ensure supplies and services
conform to prescribed requirements (see 6.2).
4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. The
inspection set forth in this specification shall become a part of the contractor's overall inspection system or
quality program. The absence of any inspection requirements in the specification shall not relieve the
contractor of the responsibility of ensuring that all products or supplies submitted to the Government for
acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing
operations, is an acceptable practice to ascertain conformance to requirements; however, this does not
authorize submission of known defective material, either indicated or actual, nor does it commit the
Government to acceptance of defective material.
4.1.2 Quality assurance terms and definitions. Reference shall be made to MIL-STD-109 to define the
quality assurance terms used.
4.1.3 Inspections. Inspections shall be in accordance with MIL-A-2550.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business