MIL-T-46691B
4.7 Inspection of packaging. The sampling and inspection of the packaging, packing, and container marking shall be in accordance with the requirements of section 5.
5. PACKAGING
5.1 Packing and marking. Packing and marking shall be Level A or B, as specified by the contractingactivity(see6.2). LevelAshallbeinaccordancewithDrawings8845243and8845244. Level B shall be in accordance with Drawings 8845244 and 9217557.
5.2 Air Force packaging. Air Force packaging shall be in accordance with TPO 00-849-0214.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful but is not mandatory.)
6.1 Intended use. Thethruster assemblyisused inconjunctionwithother propellant actuated devices in Aircrew Emergency Escape Systems.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this specification
b. Issue of DODISS to be cited in the solicitation and, if required, the specific issue of individual documents referenced (see 2.1.1 and 2.1.2)
c. If first article inspection is required (see 3.1 and 6.3)
d. The responsible inspection activity (see 4.1)
e. Any special instruction requirements (see 4.3)
f. Level of packing and marking (see 5.1)
6.3 First article. When a first article inspection is required, the contracting officer should provide specific guidance to offerors that the items should be a first article sample. The first article should consist of 5 metal parts assemblies, 9 sets of unassembled parts, 1 set of unassembled parts without plating or final protective finish, and 50 shear pins. The contracting officer should also include specific instructions in acquisition documents regarding arrangements for examination, approval of first article test results, and disposition of first articles. Invitations for bids should provide that the Government reserves the right to waive the requirement for samples for first article inspection to those bidders offering a product which has beenpreviouslyacquiredortestedbytheGovernment,andthatbiddersofferingsuchproducts,who wish to rely on such production or test, must furnish evidence with the bid that prior Government approval is presently appropriate for the pending contract. Bidders should not submit alternate bids unless specifically requested to do so in the solicitation.