/+.&6.&
15
FIGURE 1. Drogue release test configuration.
4. VERIFICATION.
4.1 Unit testing. Unit testing includes the following phases:
1.) Propellant aging
2.) WORD motor ballistic performance
3.) Rocket motor assembly test/Drogue release mechanism test
4.2 Conformance inspection. The conformance inspection shall consist of the inspections and tests
listed in 4.3, 4.4 and 4.5.
4.2.1 Conditioning period. Time for temperature conditioning prior to static firing or during
temperature cycling shall be as follows:
a. Static firing: not less than 3 hours.
b. Temperature cycling: not less than 4 hours.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business