4.7.7.1 Ignition Device sensitivity. A quantity of cartridges in accordance with table II, void of igniter and
propellant, from the first article sample and each subsequent lot shall be tested for sensitivity. In the event
loaded cartridges are selected for test, remove and discard all powder charges from the test cartridge by
sectioning the cartridge case around the periphery, 1/2 inch maximum above the base. Drop test at 15
inches (adjusted) using a steel ball l-13/l6-inch in diameter, weighing 3.94 ± 0.02 ounces, in a Ignition
Device sensitivity machine with a cartridge holder approved by the acquiring agency. The height of 15
inches shall be adjusted taking into consideration the actual weight of the ball so that the energy level
specified in 3.6.1 is achieved. Test shall be made with a drop test firing pin with a pin contour radius of
0.101 ± 0.001. Failure of the sample to comply with the requirements of 3.6.1 shall be cause for rejection
of the sample or the lot.
4.7.7.2 Ballistics.
4.7.7.2.1 First article. Thirty cartridges of the first article sample shall be grouped and temperature
conditioned as described in table III and 4.8. Following removal from the conditioning chamber, the
cartridge shall be tested as required by 3.6.2.2. Failure of any cartridge to comply with the requirements
of 3.6.2.2 shall be cause for sample rejection.
4.7.7.2.2 Production lot acceptance, Twenty-one assembled cartridges from each production lot shall be
divided into three equal groups, temperature conditioned, and fired in accordance with 3.6.2.2. Failure of
any cartridge to comply with 3.6.2.2 shall be cause for rejection of the lot. In addition to the sample of
cartridges for the above test, 10 additional cartridges shall be furnished from each production lot for
investigative purposes.
4.7.7.2.1 Sealant application. Five cartridges from each production lot shall be selected for this test. The
cartridge shall be disassembled in such a manner that determination can be made that the sealant has been
applied for the full length of the joining surfaces at the junction of the cartridge head and case sidewall
and that the propellant cavity is free of sealant. Failure of any cartridge to comply with the drawing
requirements shall be cause for rejection of the lot of cartridges.
4.7.7.3 Retest. There shall be no retests.
4.7.7.3.1 Test failure. If a test failure is attributable to an assignable cause, excluding the test cartridge,
the original test results shall be discarded and that test reconducted.
4.8 Temperature conditioning. The conditioning chamber shall be preconditioned to the specified
temperature. Once the temperature inside the chamber has stabilized, the samples shall be placed inside
and maintained at the specified temperature for 4 hours minimum, 24 hours maximum.
4.8.1 Reconditioning. The sample must be tested within five minutes after removal from the conditioning
chamber. If this time is exceeded, the cartridge shall be reconditioned in accordance with 4.8.
4.9 Inspection of packaging. The sampling and inspection of the preservation, packing, and container
marking shall be in accordance with the requirements of section 5.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the contract
or order (see 6.2). When packaging of material is to be performed by DoD or in-house contractor
11
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business