MIL-DTL-46200C
6.5.1 Ignition delay. Ignition delay time is the time measured between the firing pin striking the
primer or ignition device and the beginning of a continuous thrust rise on a thrust-time record.
6.6 Contract packaging, packing and marking. The following requirements should be specified in the
contract.
6.6.1 Packing and marking. Packing and marking should be Level A or B, as specified by the
contracting activity (6.2).
6.6.1.1 Level A. Level A packing and marking should be per Drawings 8797435 and 8797436.
6.6.1.2 Level B. Level B packing and marking should be per Drawings 8797435 and 9223384.
6.7 Subject term (keyword) listing.
Ejection systems, aircrew
Emergency escape systems, aircrew
Escape systems, aircrew
Life-saving systems, aircrew
6.8 Changes from previous issue. Marginal notations are not used to identify changes with respect to
the previous issue because of the extensiveness of the changes.
Custodian:
Preparing activity
Navy - OS
Navy - OS
Air Force - 99
(Project 1377-2005-018)
Review activity:
Air Force 70
NOTE: The activities listed above were interested in this document as of the date of this document. Since
organizations and responsibilities can change, you should verify the currency of the information above using
the ASSIST Online database at https://assist.daps.dla.mil/.
15
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business