MIL-DTL-23659F
as possible service conditions.
4.3. Engineering Design Tests. The engineering design tests are conducted to
determine the technical characteristics as indicated by the initiator design. Determination
includes the measurements of the inherent structural, electrical, or other physical and chemical
properties, and may utilize data obtained from previous tests. These tests are characterized by
controlled conditions and the elimination of human error in judgment, as much as possible,
through the use of environmental chambers, measurement techniques, and statistical analysis.
These tests include all the tests in Table I, an explanation of which is given in paragraph 4.3.1.
The engineering design test shall be conducted at a Government laboratory or, if by a
contractor, shall be witnessed and the test procedures approved by Government personnel as
assigned by the Safety Authority.
4.3.1. Explanation of Table I. The following is an explanation of the working procedure
to be utilized when working with Table I.
a. A total of 416 initiators are to be tested and all are ultimately destroyed in the
minimum 50 millisecond all-fire test, or the cook-off test, or the 40 foot drop test. Reading from
left to right along the top row, the 416 initiators are divided into 21 groups consisting of 50, 6, 6,
20, 20 etc. For example:
b. The first group consists of 50 initiators. Reading down the first column it is seen from
the "X" designations that this group of 50 initiators is to be subject to the following tests in the
sequence given:
Dielectric withstanding voltage
Radiographic
Leakage
Resistance
Static Discharge
Resistance
Stray Voltage
Resistance
Power current or Stimulus 70°F
and finally destroyed in the Minimum 50 millisecond all fire test at 70°F. Note that some tests,
such as resistance are repeated.
c. The second group consists of 6 initiators. Reading down, it is seen from the "X"
designations that this group of 6 initiators is to be subject to the following tests in the sequence
given:
Dielectric Withstanding Voltage
Radiographic
Leakage
Resistance
and finally destroyed in the 40 foot Drop. Similar reasoning applies to each of the 21 groups.
d. The total in the right hand column is the number of initiators subject to that particular