MIL-DTL-23659F
APPENDIX A
TABLE A-1. IN-LINE INITIATOR CERTIFICATION TEST MATRIX
30 30 30 30
5
10 30 30 50 50 50 50 50 50
5
REQUIREMENT
TEST
500
ABCD
E
FGHI
JKLMN
O
A.4.2
VISUAL INSPECTION
A.6.1.1 X X X X
X
XXXXXXXXX
X
500
RADIOGRAPHIC
A.6.1.2 X X X X X X X X X X X X
X
X
X
500
A.4.3
EXAMINATION
A.4.4 BRIDGEWIRE RESISTANCE A.6.1.3 X X X X X X X X X X X X
X
X
X
500
A.4.9 LEAKAGE
A.6.6
XXXXXXXXXXXX
X
X
X
500
FIRING PROPERTIES,
A.4.5
A.6.2
X
30
AMBIENT
A.4.5 FIRING PROPERTIES, COLD A.6.2
X
30
A.4.5 FIRING PROPERTIES, HOT A.6.2
X
30
MAXIMUM NO DAMAGE
A.4.6
A.6.3
X
30
CURRENT
A.4.7 THERMAL COOK-OFF
A.6.4
X
5
A.4.10 ELECTRICAL COOK-OFF*
A.6.7
X
10*
MAXIMUM ALLOWABLE
A.4.11
A.6.8
X
30
ELECTRICAL SENSITIVITY
A.4.12 1.5 METER DROPS
A.6.9
XXXX
180
ELECTROSTATIC
A.4.13
A.6.10
X
50
DISCHARGE
TEMPERATURE
A.4.8
A.6.5
XXXX
180
SHOCK/HUMIDITY
A.4.14 VIBRATION
A.6.11
XXXX
180
A.4.15 SHOCK
A.6.12
XXXX
180
A.4.2 VISUAL INSPECTION
A.6.1.1
XXXX
180
RADIOGRAPHIC
A.4.3
A.6.1.2
XXXX
180
EXAMINATION
BRIDGE CIRCUIT
A.4.4
A.6.1.3
XXXX
180
RESISTANCE
A.4.9 LEAKAGE
A.6.6
XXXX
180
ALL FIRE PERFORMANCE
A.4.16
A.6.13
X
X
100
AMBIENT
ALL FIRE PERFORMANCE
A.6.13
X
X
100
A.4.16
COLD
ALL FIRE PERFORMANCE
A.4.16
A.6.13
X
X
100
HOT
FIRING PROPERTIES,
A.4.5
A.6.2
X
30
AMBIENT
A.4.17 HIGH FIRING VOLTAGE
A.6.14
X
5
POST TEST SEAL
A.4.18
A.6.15
XXX
150
INTEGRITY **
* Additional system level testing may be required
** Post Test Seal Integrity testing is required only for ILI that must maintain a presure seal following initiation
A.4.1.3. Design Rejection and Retest Criteria. Failure of any initiator to conform to the
requirements of this specification shall be cause for rejection of the design. Before the tests are
repeated, full particulars concerning the failure(s) and action taken to correct the defects shall be
submitted for approval to the appropriate safety authority.
A.4.2. Visual Inspection. The ILI shall be visually examined and meet the manufacturer's
incoming visual inspection criteria. Visual inspection following the environmental testing shall
detail any damage found. Failure to meet the manufacturer's incoming inspection criteria shall
not necessarily be cause for failure or rejection of the ILI following environmental testing.
- 20 -
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business