MIL-C-38983A
Test
Requirement
Test
FAT
LAT
Materials
3.2
4.2.2
X
X
Primary components
3.3
-
X
X
Ignition composition
3.3.1
-
X
X
Visual inspection
3.4.1
4.5.1
X
X
Drawing conformance
3.4.2
4.5.2
X
-
Metal parts examination
3.4.2.1
4.5.2.1
X
-
X-ray examination
3.4.3
4.5.3
X
X
Bridge circuit resistance
3.4.4
4.5.4
X
X
Leakage
3.4.5
4.5.5
X
X
Power-current test
3.4.6
4.5.6
X
X
Static discharge
3.4.7
4.5.7
X
-
Stray voltage
3.4.8
4.5.8
X
-
X1
Vibration
3.4.9
4.5.9
X
Temperature shock
3.4.10
4.5.10
X
-
Impact shock
3.4.11
4.5.11
X
-
Temperature and humidity
3.4.12
4.5.12
X
-
Post environmental inspection
3.4.13
4.5.13
X
X
Ballistic test
3.4.14
4.5.14
X
X
Workmanship
3.5
-
X
X
1
Twelve cartridges shall be vibrated in accordance with 3.4.9 and 4.5.9.
4.2.2 Production lot. Cartridges required for all test purposes are selected from the production lot and
will not be applied as a part of the quantity specified for delivery by the contract. Only primary components
from a single lot shall be used in a production lot of cartridges. A cartridge lot shall consist of assemblies
produced by a homogeneous process.
4.2.3 Sampling plan. The sample size for acceptance tests shall be in accordance with the contract.
Sampling plans and procedures shall be in accordance with MIL-STD-105, general inspection level I. Twelve
cartridges required for vibration testing shall be included in this sample size.
TABLE III. First article schedule and test plan.
6
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business