MIL-T-46626C(0S)
The radiographic plate identification shall include item nomenclature, the complete lot number, the span of serial numbers displayed, and the contract number. The radiographs of the entire production lot shall accompany the ballistic sample to the activity conducting the production lot acceptance test. Defective thrusters found during X-ray review are to be marked on the X-ray prior to shipment and those defective items shall be removed from the production lot. Film interpretation of the radiographs shall verify the presence and correct positioning of the following parts:
a. Setscrew, commercial, 0.125-inch diameter, 44UNF-3A x 1I8-inch-long b. 0-ring, PIN MS28775-012
c. 0-ring, PIN MS28775-212 d. 0-ring, PIN MS28775-214 e. Keys (4), PIN 8593857
f. Trunnion, PIN 8593860
g. Sleeve, end, PIN 8593869
h. Spring, piston locking, PIN 8593871 i. Pin, shear, PIN 8593876
J. Pin, firing, PIN 8593878 k. Ring, snap, PIN 8593879
l. Ring, holding, PIN 8593880
m. Piston and plug assembly, PIN 8593881 n. Head, PIN 8593882
o. Body and pellet assembly, PIN 8593884 p. Screw, cap, socket head, PIN 8593885
q. Washer, PIN MS35338-136
r. Setscrew (2), PIN MS51964-27
s. Cartridge, impulse, M43, PIN 8593275
4.3.4 Functional.
4.3.4.1 Ballistics. The test sample shall be rigidly supported so that the entire thrust is borne by the thruster mounting points. The samples shall be tested within 10 minutes after removal from the temperature conditioning chamber. When this time limit is exceeded, the sample units shall be reconditioned at the original temperatures.
4.3.4.2 Temperature conditioning. Each assembled thruster shall be conditioned for not less than 4 hours nor greater than 24 hours. When reconditioning thrusters at •65•F, all condensation shall be removed from the exterior surfaces before returning the thruster to the conditioning chamber.
4.3.4.3 Final lock test. The test shall be performed in accordance with 3.7.2.1. The thruster fired under load condition shall be separated from the testing set-up in its "as-fired" condition and installed in a compression testing device to determine compliance with the requirements.
4.4 Inspection of packaging. The sampling and inspection of the packaging, packing, and container marking shall be in accordance with section 5.
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business