MIL-T-45499C
Major
None defined
Minor
201
Contents loose
Manual
202
Box damaged
Visual
203
Sealing strip broken or missing
Visual
204
Marking missing, incorrect, or illegible
Visual
205
Cut, damaged, or improperly sealed bag
Visual
4.2.2.7 Box, Ammunition, Packing, Drawing 8797632.
Critical
None defined
Major
None defined
Minor
201
Contents loose
Manual
202
Strapping missing, loose, broken, or improperly engaged
Visual/Manual
203
Contents of box exposed
Visual
204
Box damaged
Visual
205
Marking missing, incorrect, or illegible
Visual
206
Number of units incorrect
Visual
4.2.2.8 Box, Fiberboard (Outer), Alternative, Ammunition, Packing, Drawing 9221261.
Critical
None defined
Major
None defined
Minor
201
Contents loose
Manual/Visual
202
Carton broken or damaged
Visual
203
Number of units contained incorrect
Visual
204
Marking missing, incorrect, or illegible
Visual
205
Tape incomplete
Visual
4.2.3 Inspection testing. The following tests shall be performed in accordance with 4.3.
4.2.3.1 Breakaway torque.
4.2.3.1.1 Head and cartridge retainer. Each head and cartridge retainer subassembly shall be subjected
to a breakaway torque. Failure of any subassembly to comply with the requirements of column C, table I in
3.3 shall be cause for rejection of the subassembly.
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business