MIL-T-45498C
2.1.2 Other Government documents, drawings, and publications. The following Government
drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues
are those cited in the solicitation (see 6.2).
DRAWINGS
Naval Surface Warfare Center, Indian Head (CAGE Codes 19200 and 19203)
8593855
Thruster, Cartridge Actuated, M1A2 Metal Parts Assembly
8797631
Box, Fiberboard (Inner), Packing, Ammunition, For Thruster, Cartridge Actuated,
M1A2
8797632
Box, Packing, Ammunition, For Thruster, Cartridge Actuated, M1A2
9221261
Box, Fiberboard (Outer), Alternative, Packing Ammunition, for Thruster, Cartridge
Actuated, M1A2
U.S. Air Force
TPO 00-891-5488
Thruster, Cartridge Actuated, M1A2
(Application for copies should be addressed to: Commander, Indian Head Division, Naval Surface Warfare
Center, Attn: Data Control Branch (Code 8410), Indian Head, MD 20640-5035.)
2.2 Order of precedence. In the event of a conflict between the text of this document and the references
cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes
applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 First article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected
to the first article inspection (see 4.3 and 6.3).
3.2 Materials. All materials used in the manufacture of the thrusters shall conform to the specifications
referred to on the respective drawings unless specific approval in writing covering a departure therefrom has
been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or
methods of manufacture are specified on the drawings, the bidder's selections shall be clearly stated in the
proposal.
3.2.1 Raw material. The contractor shall be responsible for selecting from the classification list
contained in the raw material specification the surface and physical condition of the raw material intended for
use in manufacture.
3.3 Hardness and other physical properties. Hardness and other physical properties required by the
drawing shall be uniform throughout the part within specified tolerances. Requirements for all alloy steel parts
shall be achieved by quenching and tempering.
2
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business