MIL-DTL-85097/3D(OS)
NOTE
When this document is used as part of the description of work to be accomplished
by a Government activity, the safety precaution requirements of "Ammunition and
Explosives Ashore" (OP 5) should be made applicable.
6.3 Definition.
6.3.1 Rise time. The interval from 10% to 75% of the maximum thrust during the initial rise on the
thrust curve occurring just after ignition.
6.4 Subject term (keyword) listing.
Seatback
T/AV-8B
A-7
6.5 Changes from previous issue. Revision letters are not used to denote changes due to the
extensiveness of the changes.
Preparing Activity:
Navy - OS
(Project 1377-0151)
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business