MIL-DTL-23661B(OS)
6.5 Contract packaging and marking. The following packing and marking requirements should be
specified in the contract.
6.5.1 Packaging.
6.5.1.1 Level A. In addition to the following, Level A packaging should be in accordance with 49 CFR 171-
178.
6.5.1.1.1 Inner container. Four cartridges should be packaged in accordance with DL537927.
6.5.2 Packing.
6.5.2.1 Level A. In addition to the following, Level A packing should be in accordance with 40 CFR 171-
178.
6.5.2.1.1 Outer container. Twelve inner containers, as described in 6.5.1.1.1, should be packed in
accordance with DL537928.
6.5.3 Marking. Cartridge marking should be as specified on Drawing 2240773. In addition, packaging and
packing markings should be in accordance with 49 CFR 171-178 and MIL-STD-129.
6.6 Subject term (keyword) listing.
Ejection systems, aircrew
Emergency escape systems, aircrew
Escape systems, aircrew
Life-saving systems, aircrew
Preparing activity:
Navy - OS
(Project 1377-0058)
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business