MIL-C-60827A
3.6.2 Cartridge performance.
3.6.2.1 Misfires. The cartridge shall not fail to fire.
3.6.2.2 Ballistics. The cartridge, when assembled in an M26 Thruster and fired at · 60· to
· 70·F, 65· to 75·F, and 195· to 205·F and mounted normal to a load having a mass moment of inertia of 7.2
slug ft2, shall rotate the load through an arc of 90 degrees when fired. The average velocity of the load during
the first 5.75 inches of load rotation shall be 10.4 radians/second minimum. The maximum thrust shall not
exceed 7,000 pounds. Ignition delay time (see 6.5.1) shall not exceed 60 milliseconds.
3.6.2.3 Initiation. The thruster shall be fired by a source delivering an output pressure of 700
+ 25, · 0 pounds per square inch gage (psig) at the end of 15 feet of aircraft hose, MS28741-4, at 70· ± 5·F.
3.7 Workmanship. Cartridges shall be free of cracks, splits, or other defects which might prevent proper
mating with connecting parts or proper functioning of the device.
3.7.1 Metal defects. All components shall be free from cracks, splits, cold shuts, inclusions, porosity,
or any similar defect.
3.7.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or
which might be injurious to personnel handling the item.
3.7.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust, corrosion, or other
foreign matter.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the
contractor is responsible for the performance of all inspection requirements (examinations and tests) as
specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his
own or any other facilities suitable for the performance of the inspection requirements specified herein, unless
disapproved by the Government. The Government reserves the right to perform any of the inspections set
forth in this specification where such inspections are deemed necessary to ensure supplies and services
conform to prescribed requirements (see 6.2).
4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. The
inspection set forth in this specification shall become a part of the contractor's overall inspection system or
quality program. The absence of any inspection requirements in the specification shall not relieve the
contractor of the responsibility of ensuring that all products or supplies submitted to the Government for
acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing
operations, is an acceptable practice to ascertain conformance to requirements; however, this does not
authorize submission of known defective material, either indicated or actual, nor does it commit the
Government to acceptance of defective material.
4.1.2 Quality assurance terms and definitions. Reference shall be made to MIL-STD-109 to define the
quality assurance terms used.
4